stringere@sh.itjust.works to Dull Men's Club@lemmy.world · 2 months agoGot the rocks out of the driveway and started the greenhouse floor yesterday.sh.itjust.worksimagemessage-square39linkfedilinkarrow-up1397arrow-down11
arrow-up1396arrow-down1imageGot the rocks out of the driveway and started the greenhouse floor yesterday.sh.itjust.worksstringere@sh.itjust.works to Dull Men's Club@lemmy.world · 2 months agomessage-square39linkfedilink
minus-squarestringere@sh.itjust.worksOPlinkfedilinkarrow-up2·2 months agoI used a line level to get the paver supports level, then a 48" (121.92 cm) level on the beams to make adjustments. Still some minor spots to shore up but the beams being level is the main thing as that is what the greenhouse will attach to.
I used a line level to get the paver supports level, then a 48" (121.92 cm) level on the beams to make adjustments. Still some minor spots to shore up but the beams being level is the main thing as that is what the greenhouse will attach to.